Mine Safety and Health Network
MSHA
HELP
Mine Safety Regulation
The Mine Act
30C.F.R
Mine Safety Caselaw
MSHA Policy
Mine Safety Law Basics
Violations
Strict Liability
Negligence
Gravity
Joint & Several Liability: Contractors
Mine Safety Agencies
MSHA
FMSHRC
Solicitor's Office
Mines and Operators
Jurisdiction
Operators and Contractors
MSHA Rules
Standards and Regulations
Required Plans
Modification
Safeguards
MSHA Enforcement
Inspections
Special Investigations
Accident Investigations
MSHA Citations & Orders
Section 104(a)
Significant & Substantial
Failure to Abate - Section 104(b)
Unwarrantable Failure
Imminent Danger
Pattern of Violations
MSHA Penalties
Civil Penalty Assessments
Withdrawal Orders
Criminal Sanctions
Personal Liability
Conference, Contest & Appeal
MSHA Conferences
FMSHRC ALJ Proceedings
Review Commission
U.S. Court of Appeals Proceedings
EAJA & Attorney's Fees
Miners
Miners' Rights
Whistle Blower Protection
WalkAround
Inspection Request
Reporting & Record Keeping
Part 50
Other Recording Requirements
Legal Identity
MSHA FAQ
|
SMART 30 CFR
|
FMSHRC CASE FINDER
|
FMSHRC CASE ANALYSIS
Negligence
Although not determinative on liability issues, the mine operator’s behavior, generically referred to as “negligence,” plays an important role in MSHA’s enforcement of the Mine Act.
Premium Content
Behavior-Based Enforcement
MSHA Fault Finding
FMSHRC’s Legal Definitions
Knowledge & Ignorance
Ad Hoc Negligence Analysis
Relationship to Unwarrantable Failure Analysis
Gravity and Negligence
Supervisor Violations
Employee Violations
Failure to Train, Supervise & Discipline
Company Safety Policies
Get Instant Access
Lawyer Articles
Intentional Misconduct
Gross negligence
Hey, This Wasn’t A Violation When The Other Inspector Was Here
Were you aware?
Turn on These Links
Negligence News
ALJ Approves MSHA Practice of Citing Alternative Violations
Test blast to exceed standard
Quecreek Decision Holds Engineers to High Mapping Standard
ALJ Rules That MSHA Failed to Prove Violation in Accident
ALJ Rules Operator’s Drop Zone Grossly Inadequate
ALJ Fines Division Manager and Loader Operator $400.00
Ninth Circuit Overrules ALJ’s Finding That Lead Miner Was Agent
ALJ Gives Dredge Operator Some Relief after MSHA Barrage
ALJ Reduces $100,000 Penalty to $10,000 in Case Arising from Coal Roof Fall
Read More Headlines
Learn About Premium Features
|
Purchase a Subscription
|
Advertise on This Site
|
Take the Free Trial
|
Contact Us
© Libertas Corporation. 2006. All rights reserved.
The information contained on this page is NOT legal advice.